WSP Energy

WSP USA Energy

Wallingford Energy Center

Kettle Falls Fuel Yard Upgrade Detailed Engineering

Burns Harbor Microgrid

LOCATION Wallingford, Connecticut

CLIENT Wallingford Department of Public Utilities

LOCATION Kettle Falls, Washington

CLIENT Avista Energy

LOCATION Burns Harbor, Indiana

CLIENT Ports of Indiana (POI)

PROJECT ELEMENTS

PROJECT ELEMENTS

PROJECT ELEMENTS

One of the Cleanest U.S. Peaking Power Plants Design, Procurement and Construction Phase I Site Development and Phase II Detailed Design Existing Generating Station Site Decommissioning Five (5) Natural Gas Aero-Derivative Combustion Gas Turbine Generators with Air Pollution Minimization Selective Catalytic Reduction

New $20 Million Woodyard at Existing Power Plant 50-MW Electricity Production on Biomass Two (2) New Truck Dumpers One (1) New Wood Screen/Hog Conveyor to Existing Storage and Reclaim Piles Biomass Conveyors Deliver Clean Energy Boiler 80 TPHs

Microgrid Study Containing Comprehensive Feasibility of Technology, Economics and Grants Identify and Review Opportunities for On-Site Renewable Energy and Regional Biomass Wind Meteorological Mast Design and Specifications Load Analysis and Forecasting Resilience Requirements Analysis For Each Tenant $7 Million Pilot and $80 Million Full Project

° Read Case Study

° Read Case Study

° Read Case Study

Conventional and Distributive Generation

Made with FlippingBook Digital Proposal Maker