WSP Energy
WSP USA Energy
Global EV Fleet Transition Program
LA Metro EV Bus Conversion Program
Newton Garage Battery Electric Bus Charging Infrastructure
LOCATION Confidential Locations, Worldwide
CLIENT Confidential Fortune 100 Client
LOCATION Los Angeles County, California
LOCATION Camden, New Jersey
CLIENT New Jersey Transit (NJT)
CLIENT Los Angeles County Metropolitan Transportation Authority (LA Metro)
PROJECT ELEMENTS
PROJECT ELEMENTS
PROJECT ELEMENTS
Zero Emission Vehicle (EV) Technology Assessment Bus Route Modeling Infrastructure Power Modeling
Largest North American Entire Fleet Conversion 100% Zero Emissions Transit Buses and 100+ Charging Locations by 2030 11 Bus Facility Modifications Two-Phase Master Plan and Program Implementation Feasibility/Technology Assessments and Road Mapping Asset Management/Inventory and Public Outreach
Architecture Building Block (ABB) Basis of Design 30% Conceptual Design Eight (8) 150 KW Class DC Fast Chargers Overhead Dispenser Charging Configuration 10 Total Charging Dispensers (23 Maximum Option) New 13.2-kV Primary Service and On-Site Substation Charge Management System
Vehicle Deployment Roll-Out Plans Global Fleet Inventory Assessment Financial Modeling for EV Fleet Transition
° Read Case Study
° Read Case Study
° Read Case Study
Electrification
Made with FlippingBook Digital Proposal Maker